Xiaolangdi Dam

Xiaolangdi Dam
Official name 小浪底
Location Jiyuan
Construction began 1994
Opening date 2000
Construction cost US$3.5 billion
Dam and spillways
Type of dam Embankment, rock-fill
Height 154 m (505 ft)
Base width 1,317 m (4,321 ft)
Impounds Yellow River
Reservoir
Capacity 12,800,000,000 m3 (10,377,129 acre·ft)
Power station
Turbines 6 × 306MW
Installed capacity 1,836 MW
Annual generation 5.1 TWh
Website
Official website

The Xiaolangdi Dam (Chinese: 小浪底; Pinyin: Xiǎolàngdǐ) is a dam in Jiyuan, Henan Province, China, and impounds the Yellow River. The facility has a total installed capacity of 1,836 MW and generates up to 5.1 TWh annually with the help of six 306 MW turbines. The dam stands 154 m (505 ft) tall and 1,317 m (4,321 ft) wide, and cost US$3.5 billion to construct. [1][2]